“Crew Energy utilized the WACORP KWAT tool during our abandonment operations. The pressure test was achieved in a single wireline run and saved an estimated 5 hours in tubing trip and pressure test time. The objective to abandon the completed interval was completed 0.5 days earlier and saved approximately $8,000 in service rig, supervision, rentals and other auxiliary costs.”
Nick Kozak – Completions Engineer